FieldTracker+ Request a demo

Site management for electrical and installation contractors

A clear, current view of every project you run

Progress, crews, daily reports and claims, recorded as the work happens, so site and office share one reliable picture instead of finding out at month end.

Developed on active construction projects.

Drawing of an electrical installation: cable routes on four levels, those already pulled in solid lines, those still to pull dashed. A B C D 4.00 4.00 4.00 +9.60 +6.40 +3.20 +0.00 MSB DB0 DB1 DB2 DB3 Pulled To pull Project Main building Drawing Power distribution Scale 1:100 Progress 68 % Cable progress Progress claims Daily report Crews & cost Cable stock

1

one picture for site and office

Excel

your cable list imported as it is

PDF

the daily report in your company’s look, the same day

Phone

crews record from the site

  • Verifiable progress
  • Work recorded on site
  • Labour and cost control
  • Daily reporting
  • Cable stock under control
  • Forward planning
  • Every client in one place
  • Offers
  • Complete, timely claims

Sound familiar?

Where time and margin are lost today

Several versions of one schedule

Cable schedules are copied and edited in separate files, and it becomes unclear which one is current.

Costs known too late

Attendance and subcontractor days are kept on paper, so the cost of a project is known only after the fact.

Reporting that takes hours

Site managers compile the client's daily report by hand, at the end of a full working day.

Completed work left unclaimed

Claims are assembled from several sources, so completed work can be missed and payment is delayed.

Free guide

7 practices to know where every site stands

A short guide for electrical and mechanical subcontractors, with three Excel templates you can use from tomorrow. Each practice comes with a checklist for the week.

  • The guide (PDF): seven practices, from the cable schedule to the claim
  • Template 1: cable schedule, ready to import into FieldTracker+
  • Template 2: daily labour and progress sheet
  • Template 3: extra-work log

We'll send you the guide and then our newsletter with practices and offers, about once a month. You can unsubscribe from any email. Privacy

What changes

From the current situation to full visibility

The same teams and the same projects, working from a single, reliable source of information.

TodayWith FieldTracker+

Progress is estimated until the site is walked.

Progress by area and cable type is current, based on what crews record each day.

Labour cost is known at month end.

Each day shows who worked, at what cost, and the margin achieved.

The daily report takes an evening to prepare.

The daily report is produced as a branded PDF once the day is recorded.

Claims are compiled manually from several files.

Claims follow from the work completed to date, with retention, advance and VAT calculated.

Problems are reviewed after they have happened.

The cost and margin of the remaining work are visible early enough to act on.

Features

One platform for the whole project

Each module can be adopted on its own; together they cover a project from offer to final claim.

On site

What happens on site, recorded the day it happens.

  • Verifiable progress Import the cable list from Excel and see what is pulled, where and when.
  • Work recorded on site Crews report cables pulled, attendance and reel counts from their phone.
  • Labour and cost control Daily attendance of your staff and subcontractors, with labour cost per project.

In the office

Reports, stock and the work ahead, without retyping.

  • Daily reporting The client’s daily report, built from the day’s records in your company’s format.
  • Cable stock under control Every reel received, what is left of each type, and a warning before it runs out.
  • Forward planning The remaining work in order, with expected cost and margin to completion.

The business

From the first contact to the last payment.

  • Every client in one place Contacts, projects, offers and every call and meeting on one page.
  • Offers Offers from your bill of quantities, reviewed and accepted online.
  • Complete, timely claims Claims from the work actually done, so nothing goes unbilled.

Getting started

A structured introduction

No lengthy IT project. Implementation starts from the files you already use.

  1. An initial conversation

    We discuss your projects, your current files and where most time is spent today.

  2. Set-up with your data

    We import your cable schedule and staff list, and configure FieldTracker+ to match your reporting.

  3. Your team begins

    Office and site managers work from the same information, and the first daily report can be issued from the first day.

Demo

Request a demonstration

Leave your details and we will call you to arrange a demonstration using your own data.

  • Presented with data from one of your projects
  • An online session

You can also write to us at

We use these details only to respond to your request. Privacy